Introduction:Cutting Machine with Ipg
Equipment model | LZ-3015P |
Cutting area | 3000*1500mm |
Machine size | 8500*3300*2200mm |
X-axis stroke | 1520mm |
Y-axis stroke | 3020mm |
Z-axis stroke | 340mm |
X, Y axis positioning accuracy | ±0.02mm |
X, Y axis re-positioning accuracy | ±0.015mm |
X, Y axis max. positioning speed | 120m/min |
X, Y axis max. accelerated speed | 1.0G |
Main Power Protection grade | IP54 |
Machine body weight | 7.6t |
Working environment requirements
Project | Name | Request | Note |
Power | Total installed capacity | ≥30KVA | Determined based on actual machine power |
Voltage | 380±5% | Install an automatic voltage regulator and steady current device when the voltage is unstable | |
Grounding resistance | ≤4 ohm | ||
There should be no strong electromagnetic interference near the place that installs the machine. Avoid radio transmitters or relay stations around the place | |||
Cooling water | Water for cooing | MUST use purified water, deionized water or distilled water | |
Air | Oxygen, nitrogen | Purity>99.5% | Due to different processing parameters of different materials |
Air compressor | Pressure≥ 2.5mpa | ||
Working environment | Temperature | -5ºC-40ºC | |
Humidity | ≤80%, No dew | ||
Foundation | Amplitude <50um, amplitude acceleration <0.05g | If there's a seismic source, it needs to be a seismic ditch. | |
Equipment space requirements are guaranteed to be smoke-free and dust-free, avoiding dusty working environments such as metal polishing and grinding, and must be installed with anti-static floor and connecting shielded wires. |
FAQ
Q: Are you a trading company or a manufacturer?
Answer: We are factories. And we have been in the laser field for 5 years.
Q: How long is your delivery time?
A: It usually takes 3 to 10 days to receive your advance payment. The exact delivery time depends on the item and quantity you ordered.
Q: Do you provide samples? Is it free or extra?
A: Yes, we can provide samples for free, but the customer should pay the courier fee.
Q: What are your payment terms?
A: Payment <= 1000USD, 100% in advance. Payment> = 1000USD, 30% T / T in advance, the balance before shipment.